APM Phase 2 Yard Expansion RCC Project

Container Storage Facility

  • RCC Thickness: 18″
  • RCC Placement Width: 30-35′
  • Project Size: 47,000 cubic yds
  • The operation included dual-lift construction where two pavers were utilized one behind the other with a transfer machine feeding the top paver. A 10″ lift was put down with the bottom paver and the top paver followed with a 8″ lift to cap the 18″ profile.
  • Project Highlights: The Roller Compacted Concrete production was completed in 26 paving days, all in less than a month and a half. Daily production numbers averaged between 1500-1900 cubic yds of RCC per day.

Jacksonville Port Authority and CSX Railroad, Jacksonville FL

  • Intermodal Facility
  • RCC Thickness: 20″
  • RCC Placement Width: 22- 23ft
  • Project Size: 14,500 cubic yds
  • The operation included dual-lift construction where two pavers were utilized one behind the other with a transfer machine feeding the top paver.  An 11″ lift was put down with the bottom paver and the top paver followed with a 9″ lift to cap the 20″ profile.

Lowes Distribution Center- Rome, GA

  • RCC Thickness: 7 in.
  • RCC Placement Width: 30 ft
  • Project Size: 335000 square yards

Thyssen Krupp- Calvert, AL

  • Industrial Trucking Facility
  • RCC Thickness: 8 and 12 in.
  • RCC Placement Width: 12-24 ft
  • Project Size: 320000 square yards

Cargill Milling Facility- Bovina, TX

  • RCC Thickness: 7 in.
  • RCC Placement Width: 24 ft
  • Project Size: 52000 square yards