Southwest Cheese Plant, Clovis New Mexico
- RCC Thickness: 8 in.
- RCC Placement Width: 24′ and 28′ ft
- Project Size: approx 62,000 square yards
Dairy Farmers of America and Select Milk chose Roller Compacted Concrete for its fast construction, durability, and cost savings on the bottom line.
Kansas City Southern Railway Company- Wylie, TX Intermodal Facility Phase 2
- RCC Thickness: 10″ and 20″
- CTB Thickness: 6″
- RCC Placement Width: 24′ and 26′
- Project Size: approx. 35,000 sq yds of 10″ and 20″ RCC Pavement
Jacksonville Port Authority and CSX Railroad, Jacksonville FL
- Intermodal Facility
- RCC Thickness: 20 in.
- RCC Placement Width: 22-23 ft
- Project Size: 11,300 Cubic Yards
- The project consisted of dual lift construction where 11″ of pavement was put down on the bottom lift and the top was capped with a 9″ RCC lift.
Lowes Distribution Center- Rome, GA
- RCC Thickness: 7 in.
- RCC Placement Width: 30 ft
- Project Size: 335000 square yards
Thyssen Krupp- Calvert, AL
- Industrial Trucking Facility
- RCC Thickness: 8 and 12 in.
- RCC Placement Width: 12-24 ft
- Project Size: 320000 square yards
Cargill Milling Facility- Bovina, TX
- RCC Thickness: 7 in.
- RCC Placement Width: 24 ft
- Project Size: 52000 square yards
Lake Wanahoo Dam-Wahoo, NE
- RCC Thickness: 12 in.
- RCC Placement Width: 10 ft
- Project Size: 51000 square yards
Norfolk Southern Railway Rickenbacker Expansion- Columbus, Ohio
- RCC Thickness: 9 in. and 18″
- RCC Placement Width: 25 and 32 ft
- Project Size: approx 55,000 square yards of 9″ and 18″ RCC