Dams

Lake Wanahoo Dam

Rattlesnake Hallow Ash Dam

Florida Power Ponds

Florida Power Project

Peltz has completed and excelled at many Dam construction projects throughout the country as well as many Soil Cement and other non-pavement projects. Peltz’s innovation and true willingness to give the customer a great finished product has helped them create a legacy in the industry.

Rueter Hess Dam

Rueter Hess Dam

Hallam Ponds

Rueter Hess Dam

Rueter Hess Dam

Rueter Hess Dam

Rueter Hess Dam

Rattlesnake Hallow Ash Dam

Rattlesnake Hallow Ash Dam

Lake Wanahoo Dam

Lake Wanahoo Dam

Lake Wanahoo Dam

Florida Power Project

Renwick Dam

Renwick Dam

Renwick Dam

Renwick Dam

Renwick Dam Rehabilitation – Pembina County, ND

  • RCC Thickness: 12 inch Lifts
  • 6 Inch Road Paved with ABG Paver
  • RCC Width: 14-16 foot wide Step
  • 22 foot wide Road
  • Project Size: 20,000 cubic yards of RCC
  • Description: Peltz Companies, Inc. was hired as the qualified RCC subcontractor for the project and worked as a RCC Consultant on the entirety of the RCC portion of the project from the pre-construction phase until the completion of the work.

Lake Wanahoo Dam, Wahoo, NE

  • RCC Thickness: 12 in.
  • RCC Placement Width: 10 ft
  • Project Size: 51000 square yards
  • RCC Steps Constructed for Primary and Auxiliary Spillway & Five Lifts of 8″x 50′ wide x 300′ long Paving for Stilling Basin

Hallam NPPD Sheldon Station, Hallam, NE

  • 39000 square yds (Project Size)
  • 12 inch RCC Thickness
  • 20 foot placement width
  • Paved Bases and Side Slopes for Plant Discharge Water Cooling and Storage Pond as well as Roads within the Facility

Rattlesnake Hallow Ash Dam, Gorgas, AL

  • 12,750 cubic yds
  • 14 foot placement width
  • 9 inch RCC Thickness
  • Each lane was placed in 9″ Lifts in a stair stepped pattern Grout was used between each lift as using multiple pavers was not possible

Lyman Run Dam, Lyman, PA

  • 16,000 cubic yds
  • RCC Spillway Construction

Rueter Hess Dam, Parker, Co

  • 183,000 cubic yards of Soil Cement
  • Construction of dam and spillway embankment

Florida Power & Light, Bartow, FL

  • 100,000 cubic yds Soil Cement
  • Mixed and Placed for plating 3:1, 4:1 and 5:1 sloped embankments for cooling ponds